PT Long Rich Indonesia
Date: June 16, 2025
Overview
HIJAU has partnered with PT Long Rich Indonesia, a footwear manufacturer based in Cirebon, West Java. Initiated in 2025, the project supports the company's efforts to enhance energy efficiency throughout its production facilities.
Project Details
Challenges
A key challenge in this project was the medium-voltage (MV) interconnection, which required transformer capacity upgrades to connect the solar PV system to the existing electrical network. To ensure uninterrupted operations and maintain power supply reliability, the interconnection work was scheduled during weekends.
Our Solution
HIJAU performed a comprehensive evaluation of the transformer capacity and MV components to enable a safe and reliable interconnection between the solar PV system and the existing electrical network. The interconnection works were scheduled during weekends to minimize downtime, maintain uninterrupted operations, and ensure efficient project execution.
Result
The solar PV installation enables PT Long Rich Indonesia to support its sustainability goals by reducing carbon emissions by up to 45,551 tons, equivalent to the environmental impact of planting approximately 121,469 trees. This initiative demonstrates the company's commitment to advancing its renewable energy transition and adopting more environmentally responsible operations.
About Project
Status
COMPLETED
Location
Cirebon
Capacity
2,560 kWp
Carbon Reduction
45,551 CO2