Admin Hijau Solar Panel Installation in the Battery Industry in Karawang Hijau is collaborating with one of Southeast Asia's first electric battery manufacturing companies on a project to support sustainable energy through the installation of a rooftop solar power system (... Current Project Jan 27, 2025 Proyek sedang berjalan
Admin Hijau Solar Panel Installation at PT Combiphar HIJAU is currently installing a rooftop solar power system (PLTS) at Combiphar's factory. As a company with 53 years of experience in the pharmaceutical industry, Combiphar is deeply committed to rene... Current Project Jan 27, 2025 Proyek sedang berjalan
Admin Hijau Solar Panel Installation at PT Dharma Polimetal Tbk In the automotive component industry, electricity usage is crucial and highly significant for the production process. Therefore, PT Dharma Polimetal Tbk is committed to reducing carbon emissions, mini... Current Project Jan 27, 2025 Proyek sedang berjalan
Admin Hijau Solar Panel Installation at PT Wintai Garment HIJAU is currently undertaking a rooftop solar power system (PLTS) installation project at PT Winka Garment, a company operating in the textile industry. The company aims to reduce its environmental i... Current Project Jan 27, 2025 Proyek sedang berjalan
Admin Hijau Solar Panel Installation at PT Setia Kawan Makmur Sejahtera HIJAU is currently working on a 1590 kWp rooftop solar power system (PLTS) installation project with PT Setia Kawan Makmur Sejahtera. As a company operating in the waste recycling sector, HIJAU is str... Current Project Jan 27, 2025 Proyek sedang berjalan
Admin Hijau Solar panel installation at PT Wijaya Tri Utama Plywood Industries (WTUPI) HIJAU is currently undertaking a 684 kWp rooftop solar power system (PLTS) installation project with PT. Wijaya Tri Utama Plywood Industry (WTUPI) Industry. The company operates in the wood processing... Current Project Jan 27, 2025 Proyek sedang berjalan
Admin Hijau Solar Panel Installation at PT Inkoasku / Pako Group (Phase 2) PT Inkoasku has partnered with HIJAU for the installation of a second-phase rooftop solar power system (PLTS). Previously, PT Inkoasku had already been using a rooftop solar power system. However, due... Current Project Jan 27, 2025 Proyek sedang berjalan
Admin Hijau Solar Panel Installation at Lippo Plaza Keramat Jati HIJAU is currently working on a solar PV installation project at Lippo Plaza Kramat Jati, Jakarta, with a capacity of 458.3 kWp. This is the second project following the successful installation of sol... Current Project Jan 27, 2025 Proyek sedang berjalan
Admin Hijau Solar Panel Installation at Lippo Plaza Mall Batu HIJAU is currently installing a 369.7 kWp solar PV system at Lippo Mall in Batu City. This marks the third collaborative project between HIJAU and Lippo, demonstrating Lippo's commitment to transition... Current Project Jan 27, 2025 Proyek sedang berjalan
Admin Hijau Solar Panel Installation at Lippo Cikarang Mall (Phase II) HIJAU installed a 765 kWp rooftop solar power system (PLTS) at Lippo Cikarang Mall in Phase I of 2024. After the completion of the first project, Lippo Cikarang Mall proceeded with the installation of... Current Project Jan 27, 2025 Proyek sedang berjalan
Admin Hijau Solar Panel Installation at PT CJ Feed and Care Project Overview PT CJ Feed and Care, a company operating in the animal feed industry, required an energy solution to reduce its reliance on PLN (Indonesia's state-owned electricity company) and lower... Finished Project Nov 12, 2024 Proyek Selesai
Admin Hijau Solar Panel Installation at Sampoerna Kayoe, Jombang Project Overview Wood processing industries like Sampoerna Kayoe require a stable energy supply to maintain optimal electricity quality. HIJAU was tasked with designing and implementing a Solar Power ... Finished Project Nov 12, 2024 Proyek Selesai