HIJAU is collaborating with PT Pei Hai International. Located in Jombang, East Java, the company operates in shoe manufacturing. The project began in October 2025.
Project Details
The rooftop solar PV installation at PT Pei Hai International has a capacity of 1,515.5 kWp. Through detailed calculations, the HIJAU team ensured that this capacity is adequate to meet the operational needs of PT Pei Hai International.
Challenges
This project presents its own challenges in the ongoing construction process. HIJAU considered the stability of the electricity supply to ensure smooth production activities during the construction process.
Our Solution
HIJAU ensured the solar PV installation stayed on schedule while adhering to construction safety and security standards. Continuous coordination with all parties was carried out to ensure the process proceeded smoothly without any obstacles.
Result
Through the implementation of this solar PV system, PT Pei Hai International contributes to reducing carbon emissions by 30,865 tons, equivalent to planting 49,384 trees. This initiative reflects the company’s commitment to transitioning toward the use of more environmentally friendly renewable energy.
About Project
Status
ON-PROGRESS
Location
Jombang
Capacity
1,515 kWp
Carbon Reduction
30,865 CO2