PT Alkindo Naratama Tbk


Overview

HIJAU has installed a rooftop solar PV system at PT Alkindo Naratama, Tbk. PT Alkindo Naratama, Tbk operates in the paper manufacturing industry and is located in Padalarang, Bandung, West Java. As a subsidiary of Alkindo Group, PT Alkindo Naratama, Tbk is committed to transforming toward sustainable energy.

Project Details

PT Alkindo Naratama, Tbk entrusted HIJAU with the rooftop solar PV installation project at its factory. The rooftop solar PV system at PT Alkindo Naratama, Tbk has a capacity of 868 kWp and was completed in September 2025. Through this collaboration, HIJAU facilitated PT Alkindo Naratama, Tbk’s transition to clean energy in support of the company’s long-term sustainability.

Challenges

The collaboration project between HIJAU and PT Alkindo Naratama, Tbk proceeded smoothly. However, the construction process faced challenges due to a tight and demanding schedule. This required the HIJAU team to coordinate closely with all parties to accelerate construction effectively while maintaining proper safety standards and accuracy.

Our Solution

HIJAU’s coordination with all involved parties successfully improved the effectiveness of the construction process and the efficiency of work, keeping it on schedule. HIJAU also ensured that the installation of the 307.5 kWp solar PV system was carried out safely and smoothly, minimizing any disruption to ongoing operations. The real-time monitoring system provided by HIJAU helps PT Alkindo Naratama, Tbk track the performance of the solar PV system for daily production and operational needs.

Result

The rooftop solar PV installation at PT Alkindo Naratama, Tbk has delivered an energy capacity of 868 kWp. This installation contributed to environmental protection by reducing carbon emissions by 21,226 tons, equivalent to planting 33,962 trees. The collaboration reflects the company’s strong commitment to transitioning toward environmentally friendly renewable energy. This initiative also successfully helps alleviate the company’s operational and production costs.

About Project
Status

COMPLETED

Location

Bandung

용량

868 kWp

탄소 감축

21,226 CO2