Solar Panel Installation at PT APL

About the Project
Done On 11/12/2024
Company:
PT Anugerah Pharmindo Lestari
Location:
Kelapa Gading

Project Overview

PT APL, a leading pharmaceutical company in Indonesia, required a reliable and cost-effective energy solution to support its operations. HIJAU was entrusted with designing and installing a rooftop solar power system (PLTS) at their factory, focusing on reducing energy costs without compromising quality and production performance.

Challenges Faced

The main challenge of this project was to ensure a stable and reliable energy system to support pharmaceutical production processes, which are highly sensitive to power fluctuations. Additionally, maintaining sustainability without disrupting daily operations was a key hurdle to overcome.

HIJAU's Solution

HIJAU designed a PLTS system integrated with the high energy demands of the pharmaceutical factory. By utilizing high-capacity solar panels, HIJAU ensured a stable energy supply around the clock. The system was also equipped with real-time monitoring features to minimize the risk of disruptions and maximize energy efficiency.

Results & Benefits

With the implementation of the PLTS, PT APL successfully reduced energy costs by up to 25% and ensured a stable energy supply to support their production processes. Furthermore, the company significantly reduced its carbon footprint, aligning with its commitment to environmental sustainability.