Solar Panel Installation at PT Setia Kawan Makmur Sejahtera

About the Project

Done On
Company:

PT Setia Kawan Makmur Sejahtera

Location:

Tulungagung

HIJAU is working on a project with PT Setia Kawan Makmur Sejahtera to install a 1590 kWp rooftop solar power system. As a company engaged in waste recycling, it has a strong commitment to being environmentally friendly. The development of this solar PV system serves as tangible proof of its transition to renewable and environmentally friendly energy.

Project Overview

The rooftop solar PV system, with a capacity of 1590 kWp, is currently being installed on the factory roof of PT Setia Kawan Makmur Sejahtera, covering an area of approximately 1.5 hectares with 3,400 solar panels. The installation is expected to be completed in 2025. Once operational, the system will replace 5-10% of the electricity typically generated from fossil fuels with renewable and environmentally friendly energy.

Challenges Faced

In this project, HIJAU faced challenges such as the need for roof repairs before installing the rooftop solar PV system. Therefore, effective collaboration and communication between PT SKMS, technicians, the factory, and the HIJAU team were crucial to ensure a smooth installation process and timely completion as agreed.

Solutions From HIJAU

Before the installation, the HIJAU team conducted surveys, inspections, and recommended roof repairs to ensure safety, as the rooftop solar PV system is intended for long-term use.

Results and Benefits

Upon completion of the rooftop solar PV installation, the company will save 5-10% on electricity and operational costs. This initiative aligns with supporting ESG principles, enhancing PT SKMS's appeal to investors, reducing operational expenses, and reinforcing its commitment to being an environmentally friendly company.