Solar Panel Installation at PT APL

About the Project

Done On

12/11/2024

Company:

PT Anugerah Pharmindo Lestari

Location:

Kelapa Gading

Project Overview

PT APL, a leading pharmaceutical company in Indonesia, requires reliable and cost-effective energy solutions to support its operations. HIJAU has been entrusted to design and install a rooftop solar PV system at their factory, focusing on reducing energy costs without compromising production quality and performance.

Challenges Faced

A key challenge in this project was ensuring a stable and reliable energy system to support the pharmaceutical production process which is highly sensitive to power changes. In addition, maintaining sustainability without disrupting daily operations was a challenge that had to be overcome.

HIJAU's Solutions

HIJAU designs a solar PV system integrated with the high energy demands of the pharmaceutical factory. By utilizing high-capacity solar panels, HIJAU ensures a stable energy supply at all times. The system is also equipped with real-time monitoring features to minimize disruption risks and maximize energy efficiency.

Results & Benefits

With the implementation of this solar power plant, PT APL managed to save up to 25% in energy costs, as well as ensure a stable energy supply to support their production process. In addition, the company also managed to reduce its carbon footprint, in line with their commitment to the environment.