Solar Panel Installation at PAKO 2W (Pako Group) Phase 2

About the Project

Done On
Company:

Pako 2W (Pako Group)

Location:

Karawang

Pako Group is a subsidiary of Astra Otoparts Tbk. Hijau helped Pako Group to install rooftop PLTS in the second phase of 535.8 kWp. The installation of PLTS in phase II was carried out due to adjusting to electricity needs and in accordance with the company's commitment to switch to renewable energy.

Project Overview: 

Hijau is in the process of installing solar power plant in Pako Group for the second phase of 535.8 kWp. The installation of the second phase is carried out to adjust the electricity needs of Pako Group. The installation of the second phase is expected to be completed in 2025. 

Obstacles Faced:

The installation at Pako Group was carried out in the rainy season which will be a challenge to be done on time but in accordance with the standards. As a company engaged in automotive production, it must ensure that the electricity supply is stable and will not disrupt the production process.

Solution from Hijau:

Hijau assisted Pako Group for the installation of PLTS in phase II and helped the company to fulfill their electrical energy needs to switch to renewable energy.

Results & Benefits: 

After the installation of PLTS in phase II is completed, Pako Group will maximize the use of rooftop PLTS tailored to its needs and will reduce operational costs, increase company value and participate in reducing carbon emissions in Indonesia.