Proyek Selesai
November 12, 2024

Solar Panel Installation at Sampoerna Kayoe, Jombang

HIJAU ensures that the factory's electricity quality remains well-maintained.

Project Overview

Wood processing industries like Sampoerna Kayoe require a stable energy supply to maintain optimal electricity quality. HIJAU was tasked with designing and implementing a Solar Power Generation System (PLTS) to reduce reliance on PLN electricity and enhance operational sustainability.

Challenges Faced

One of the biggest challenges is maintaining stable electricity quality in the wood processing factory environment, where power fluctuations could impact production quality. Additionally, the HIJAU team had to ensure the system could operate without interruptions under demanding environmental conditions.

HIJAU's Solution

HIJAU designed a PLTS system capable of adapting to the electricity demands of the wood processing factory. The system is designed to provide stable and high-quality energy supply, supporting factory operations without disrupting production processes. Furthermore, the system is equipped with energy storage technology to ensure consistent power supply.

Results and Benefits

By installing PLTS at Sampoerna Kayoe, the factory successfully saved up to 22% of its annual electricity costs while maintaining high production quality. The system also supports the company's sustainability initiatives by significantly reducing carbon emissions.