Solar Panel Installation at PT Inkoasku / Pako Group (Phase 2)

About the Project
Done On
Company:
PT Inkoasku
Location:
Karawang

PT Inkoasku has partnered with HIJAU for the installation of a second-phase rooftop solar power system (PLTS). Previously, PT Inkoasku had already been using a rooftop solar power system. However, due to increasing electricity demand, they decided to proceed with the installation of the second-phase rooftop solar power system.

Project Overview

PT Inkoasku is a company that produces automotive components. PT Inkoasku is collaborating with HIJAU to install a 369.4 kWp second-phase rooftop solar power system in Karawang. The installation of the rooftop solar power system is targeted for completion by 2025. This is a concrete step by the company to transition to renewable energy.

Challenges Faced

Since the company had already completed the installation of the first-phase rooftop solar power system, the second-phase installation presented unique challenges. However, HIJAU provided innovative solutions and competitive pricing while ensuring the highest quality and safety for each project.

HIJAU's Solution

HIJAU designed the second-phase rooftop solar power system with a strong emphasis on safety, as the electricity supply for an automotive component manufacturing plant must be stable. Once the installation is completed, PT Inkoasku will be able to meet the energy demands of its production facilities while benefiting from a more cost-effective and environmentally friendly energy source.

Results and Benefits

After the completion of the rooftop solar power system installation project, PT Inkoasku successfully met its renewable energy needs and demonstrated its commitment as an environmentally friendly company.