HIJAU is currently installing a rooftop solar power system (PLTS) at Combiphar's factory. As a company with 53 years of experience in the pharmaceutical industry, Combiphar is deeply committed to renewable energy, and HIJAU is helping to realize this vision by installing a 601.9 kWp rooftop solar system. 

Project Overview

As a large pharmaceutical company with the tagline "Championing A Healthy Tomorrow," Combiphar is dedicated to promoting a healthier future, and HIJAU is supporting this mission through action. HIJAU is installing a 601.9 kWp rooftop solar system in Padalarang, with the project expected to be completed by 2025. Once installed, the system will directly reduce the use of fossil fuel-based electricity and lower the company's operational costs.

Challenges Faced

In this project, we must ensure that the installation process does not disrupt Combiphar's daily operations, as the production of pharmaceutical products cannot be interrupted. Additionally, the installation is taking place during the rainy season, which presents an added challenge to completing the work on time while maintaining high safety standards.

HIJAU's Solution

HIJAU conducted a site survey and designed the system to meet the factory's substantial energy needs of 601.9 kWp. We ensured a smooth and safe installation process while maintaining stable energy supply. After installation, HIJAU also provides real-time monitoring to minimize potential risks.

Results and Benefits

The 601.9 kWp rooftop solar system installed at Combiphar will reduce the use of fossil fuels, aligning with the company's vision of "Championing A Healthy Tomorrow" and supporting its commitment to sustainable energy.