Solar Panel Installation in the Battery Industry in Karawang

About the Project
Done On
Company:
Industri Baterai di Karawang
Location:
Karawang

Hijau is collaborating with one of Southeast Asia's first electric battery manufacturing companies on a project to support sustainable energy through the installation of a rooftop solar power system (PLTS). As part of this collaboration, Hijau will assist in the installation of a 7144 kWp solar PV system.

Project Overview

Hijau is installing a 7144 kWp rooftop solar power system at a factory located in Karawang. The project is set to begin in November 2024 and is expected to be completed by 2025. Through this project, Hijau aims to reduce fossil fuel usage, lower carbon emissions, and minimize environmental impact.  

Challenges Faced

The installation process at the battery factory will take place during the rainy season, posing a unique challenge. However, Hijau is committed to completing the project on time while maintaining high safety standards by fostering clear communication between the company, technical teams, and other relevant stakeholders.

Hijau's Solution

Hijau designs customized solar power systems tailored to the needs of each factory. The PLTS is built to withstand all weather conditions, including thunderstorms. The system utilizes high-quality solar panels to maximize solar energy utilization and reduce electricity costs from PLN (Indonesia's state electricity company). Additionally, Hijau provides regular monitoring and maintenance services.

Results and Benefits

Once the project and installation are completed, the factory will save on operational costs, enhance its reputation as an environmentally friendly company, and secure a reliable energy source. This will also reduce the risk of power outages that could disrupt factory operations.