Solar Panel Installation at Sampoerna Kayoe Jombang

About the Project

Done On

12/11/2024

Company:

Sampoerna Kayoe Jombang

Location:

Jombang

Project Overview

The wood processing industry, such as Sampoerna Kayoe, requires a stable energy supply to maintain optimal electricity quality. HIJAU is tasked with designing and implementing a solar power system that can reduce reliance on PLN electricity and enhance operational sustainability.

Challenges Faced

One of the biggest challenges is maintaining stable electricity quality in the wood processing factory environment, where power fluctuations can affect production quality. Additionally, the HIJAU team must ensure that the solar power system can operate without interruptions under demanding environmental conditions.

HIJAU's Solutions

HIJAU has designed a solar power system that can adapt to the electricity needs of the wood processing factory. This system is engineered to provide a stable and high-quality energy supply, supporting the factory's operations without disrupting the production process. Additionally, the system is equipped with energy storage technology to ensure a consistent electricity supply.

Results & Benefits

With the installation of the solar power system at Sampoerna Kayoe, the factory has achieved savings of up to 22% on annual electricity costs while maintaining high production quality. This system also supports the company's sustainability initiatives by significantly reducing carbon emissions.

Project Gallery

Give Your Feedback