Instalasi Panel Surya di PT Combiphar

About the Project

Done On
Company:

PT Combiphar

Location:

Padalarang, Jawa Barat

HIJAU is currently installing a rooftop solar PV system at Combiphar's factory. As a pharmaceutical company with 53 years of experience, Combiphar is highly committed to renewable energy. HIJAU is helping to realize this commitment with the installation of a 601.9 kWp rooftop solar PV system. 

Project Overview

As a leading pharmaceutical company with the tagline "Championing A Healthy Tomorrow", HIJAU is here to help make this vision a reality. HIJAU is installing a 601.9 kWp rooftop solar PV system in Padalarang, with the project expected to be completed in 2025. Once the installation is finished, it will help reduce the use of fossil fuel-based electricity and directly lower the company's operational costs.

Challenges Faced

In this project, it is crucial to ensure that the installation is carried out without any disruptions, as Combiphar is a pharmaceutical company where operations cannot be disturbed. The installation is also taking place during the rainy season, posing a unique challenge to complete the project on time while maintaining the highest safety standards.

Solutions From HIJAU:

HIJAU conducted a survey and tailored the solution to meet the factory's significant energy needs of 601.9 kWp. We also ensured that the installation process proceeded smoothly, safely, and with stable energy output. After the installation, HIJAU continues to monitor the system in real-time to minimize potential risks.

Results & Benefits

The installation of a 601.9 kWp rooftop solar PV system at Combiphar will reduce the use of fossil fuels, aligning with the company's vision of "Championing A Healthy Tomorrow" and supporting sustainable energy initiatives.